hospitality renovations & FF&E Install

  • 20 Years experience in hotel renovation includes PIP projects

  • Unique designed system and process to complete room programs quickly

  • Labor is employed by Designer Walls

  • From TV change-outs to complete turn-key renovation

Services We Provide:

  1. Liquidation of FF&E

  2. Demo of all finishes and hardware

  3. Installation of new finishes including painting, wallcovering, “knock down,” and spray texture

  4. All wall repair including drywall and plaster

  5. Installation of carpet and tile

  6. Installation of hardware and drapery

  7. Move and/or manage all FF&E

  8. Vanities, tops, furniture reconfiguration and TV or mattress change-outs

  9. Bathroom renovations including tub to shower conversions and cultured marble tub surrounds

 

 

Our Work

staybridge suites | Stow, Ohio

In 2021 we have started the full PIP renovation of the Staybridge Suites in Stow, Ohio. This includes the renovation of 93 guest rooms as well as their public spaces.


Holiday inn express | wooster, oh

In 2020 we completed the installation of all the FF&E for this beautiful new property.


blu-tique hotel | akron, oh

In 2019 we completed the installation of all the FF&E for this unique and fun project.



Springhill suites | Estero, fl

In 2019 we completed the installation of all the FF&E for the beautiful new build.


Holiday Inn Express and Suites | Madison, OH

In 2019 we completed the installation of all the FF&E.


Residence Inn | Cleveland, OH

In 2019 we completed the installation of all the FF&E.


AC Hotel | Beachwood, OH

In summer of 2018, the Designer Walls team installed all the new furniture in the AC Hotel in Beachwood – a new flag under the Marriott brand. The hotel is a focal point of the new premier Pinecrest shopping area and we were honored to get to work with our friends at the Delmonte Hotel Group to put the finishing touches on this unique and beautiful project.


Hampton Inn | Stow, OH

In 2017, we completed a full renovation of the guestrooms at the 84-room Hampton Inn & Suites in Stow, OH. The PIP included:

  • Tile flooring in the bath and entry

  • New carpet tile and Johnsonite millwork vinyl base

  • Wallcovering and paint

  • All new FF&E, vanities, sinks, and vanity lighting


Hampton Inn | Wooster, OH

The Hampton Inn & Suites in Wooster, Ohio received a full renovation of guestrooms, baths, and corridors in the winter of 2016 – 2017, including:

  • All new wall finishes including wallcovering, patching of knockdown texture, and paint.

  • New carpet tile and Johnsonite millwork vinyl base in the guestrooms, and double glue application of corridor carpet and carpet base.

  • New cultured marble tub surrounds in all rooms, and full replacement of tubs in 50% of the hotel.

  • ADA compliance upgrades in specified guestrooms.

  • Replacement of existing egg-crate lighting with new smooth drywall soffit and can lights.

  • All new door hardware and new closet doors.

  • Installation of new FF&E including vanities, stone tops, and sinks.


Residence Inn | Lafayette, LA

Renovation Management and FF&E Installation

  • Coordinate schedule and manage all areas of renovation for a 6 year PIP, including bidding process and selection of all sub-trades.

  • Installation of new furniture, lighting, artwork, vanity lighted mirrors, and interior signage.

  • 93 total guest rooms.


Springhill Suites | Solon, OH

In 2018 we completed a full guestrooms and corridor renovation at the 120-room SpringHill Suites in Solon, OH. The PIP included:

  • New wallcovering throughout the corridor, bath and room.

  • New carpet and light fixtures, including re-wiring for a backlit mirror.

  • Installation of new soft seating and select casegoods, while coordinating storage of remaining FF&E.

  • Storage of all new FF&E in Designer Walls warehouse and coordination of deliveries to the hotel.


Holiday Inn Express | Kent Island, MD

General Contracting and FF & E Installation

  • Reviewed subcontractor proposals for errors and oversights.

  • Coordinated subcontractor schedules and supervised project.

  • Installed new furniture.


The Glidden House | Cleveland, OH

The Glidden House is a boutique hotel built in the historic Glidden Mansion in University Circle that provides one of the most unique experiences for travelers visiting Cleveland. For the third time since the hotel’s establishment in 1987, the Glidden House is partnering with Designer Walls for another complete renovation of the guestrooms, keeping the historic feel in sync with modern conveniences and style. This latest remodel included new paint, designer wallcovering, and window treatment for the hotels 52 standard guestrooms.

Ask us about our 2015 project at the Glidden House, and take a look back at our last renovation in 2009.


Kent State Hotel and Conference Center | Kent, OH

Designer Walls was contracted to install all room furnishings from toilet paper holders to beds and headboards for the new 93 room Kent State University Hotel and Conference Center. Our team unloaded, assembled, and installed these items with care and efficiency.


Hilton Garden Inn | Pittsburgh, PA

In Pittsburgh, Pennsylvania we worked with the New York based Delmonte Hotel Group on a beautiful new Hilton Garden Inn hotel. We installed all the new furniture, including wall-mounted headboards that weighed nearly 200 pounds.


Residence Inn | Avon, Oh

To start off 2016, we worked on the Furniture, Fixtures, and Equipment (FF&E) installation at the brand new Residence Inn Avon at the Emerald Event Center. Our expert team handled everything from bringing furniture in through the 5th floor window while the elevators were being inspected, to figuring out the most efficient way to hang all the art, mirrors and headboards. We even stored the furniture in our warehouse until the hotel was ready!


Springhill Suites | Independence, Oh

We spent the spring of 2016 installing all the new furniture in the brand new Springhill Suites right down the street from our offices in Independence. This project was a challenging one with tight deadlines to be ready for the Republican National Convention (RNC) coming to town, but it was an awesome opportunity to help get our city prepared for all the visitors!


Hampton Inn | North Olmsted, OH

The Designer Walls team spent the fall of 2016 helping the new Hampton Inn & Suites in North Olmsted get all the furniture installed and assembled. We love working on Hampton Hotels and we’ve been doing it just about as long as our company has been around, so we’ve seen first hand all the changes. The brand’s new furniture is modern and functional, but it’s certainly a little more complicated than it used to be, which is why every hotel should have a competent and experienced installer on their team! We were happy to be able to help make this project a success.


Home2 Suites | Independence, OH

We’re proud to be among the first companies in Ohio to install FF&E (furniture, fixtures, and equipment) at Home2 Suites – the new extended stay brand by Hilton. Home2’s signature furniture design includes the “Working Wall:” a full wall of built in furniture designed to provide everything you need to feel like you’re in your second home. The installation required our top team members to install as many as 20 separate pieces of furniture in each room, attaching each piece together and to the wall to create the continuous “Working Wall.”


Ohio University Inn – Athens, Oh

TV change-outs are one of our favorite projects to do and at the end of summer 2016 we got to take a quick trip south to take care of one at the Ohio University Inn. We’ve worked our process to perfection and we’re able to change out an entire occupied hotel’s TVs in just a few days. This property threw some added challenges our way with three separate buildings and no elevators, but we were still able to replace 144 TVs in two days–just in time for the crowds to arrive for orientation at Ohio University.


Home2 Suites | Stow, Oh

In Fall 2017, the Designer Walls team installed FF&E (Furniture Fixtures and Equipment) at our second new Home2 Suites. This new hotel brand includes a full wall of furniture and cabinetry that our team sorts, assembles and installs in addition to the standard vanities, headboards, art, and soft seating.

Home2 furniture installation presents a unique challenge that we are proud to have mastered with our team’s meticulous attention to detail and organization.


Hilton Garden Inn | Mayfield, Oh

Project Grow Lobby Renovation

  • Constructed drywall ceiling framing and installed new pendant lighting.

  • Performed painting and wallcovering installation.

  • Installed new art, signage, and decals.

  • Installed new drapes.


TownePlace Suites | Solon, Oh

In the summer of 2018, the Designer Walls team installed all the furniture in the new TownePlace Suites in Solon, Ohio built by our partners at PrideOne Construction.